Test Report
BGD Epic 2 S | 32014
Equipment
BGD Epic 2 S | 32014
Production Date: Not available
Service
Passed
Rating
Used, good conditions
Comment
EP033N
Date
21. October 2026
Next Service
October 2028
or after 100 flight hours
Service Center
Eagles Service di Di Ciano Lavinia
Checker: Lavinia Di Ciano
Notice
Your glider has undergone a service. Before flying, it is essential that you test-inflate and thoroughly check it.
Gallery
Porosity Test
| Gauge |
HELLO |
| 1. Measurement |
390 [s] |
| Rating |
Passed |
Visual Inspection: Canopy
| Rods |
Passed |
| Loops |
Passed |
| Topsail |
Passed |
| Cell walls |
Passed |
| Lower sail |
Passed |
| Leading edge |
Passed |
| Rating |
Passed |
Visual Inspection: Lines
| Main lines |
Passed |
| Brake lines |
Passed |
| Gallery lines |
Passed |
| Rating |
Passed |
Visual Inspection: Risers
| Risers |
Passed |
| Line locks |
Passed |
| Speed system |
Passed |
| Rating |
Passed |
Linen Tear Strength
| Right / 2A1 |
Minimum strength: 35 daN / Measured strength: 153 daN - Passed |
| Rating |
Passed |